ABSTRACT

Human society needs for security and development such technical facilities that ensure products and services, which are safe, i.e. they fulfil well their functions and do not threaten themselves and their surroundings not under their critical conditions. To ensure the coexistence between technical facility and its surrounding, it is necessary to begin with measures against relevant risk at preparation of terms of references, designing, building, testing and commissioning. The article deals with risk management plan for complex technical facilities during the life cycle stage involving the design, construction, outfit by technology equipment, testing and commissioning. Its aim is to make resilient ground for the co-existence of technical facilities with their surroundings during their existences.

KEYWORDS

Risk, technical facility, designing, construction, testing, commissioning, safety, risk management plan.

 

Cite this paper

Prochazkova Dana, Prochazka Jan. (2020) Risk Management Plan for Technical Facility Designing, Manufacturing and Commissioning. International Journal of Economics and Management Systems, 5, 75-85

 

cc.png
Copyright © 2020 Author(s) retain the copyright of this article.
This article is published under the terms of the Creative Commons Attribution License 4.0